国产成人综合亚洲网址,中文字幕一区2区3区,国产精品高清国产三级国产AV,无人区乱码1区2区3区免费

The company's 2018 annual meeting ended successfully

Last update:2019-11-06

China Energy Bureau data show that in November, China's new 220 kV and above lines totaled 2,080 kilometers, an increase of 35.2%. In the first 11 months of this year, China's new 220 kV and above lines totaled 34,225 kilometers, an increase of 24

China Energy Bureau data show that in November, China's new 220 kV and above lines totaled 2,080 kilometers, an increase of 35.2%. In the first 11 months of this year, China's new 220 kV and above lines totaled 34,225 kilometers, an increase of 24.4. %. The 220 kV and above lines of the power grid construction are mainly high-voltage aluminum cables such as steel-cored aluminum stranded wire and aluminum-clad steel-core aluminum stranded wire. The new line length has increased year by year, indicating that the domestic high-voltage transmission line is still in a high-speed growth trend. According to statistics, in the first 11 months of 2013, China's power grid infrastructure construction investment was 337.3 billion yuan, an increase of 6.1% year-on-year. Relevant media believe that in 2013, the domestic new wire and cable laying is mainly based on UHV power grid construction. It is reported that the State Grid Hami-Zhengzhou UHV DC


China Energy Bureau data show that in November, China's new 220 kV and above lines totaled 2,080 kilometers, an increase of 35.2%. In the first 11 months of this year, China's new 220 kV and above lines totaled 34,225 kilometers, an increase of 24.4. %.


The 220 kV and above lines of the power grid construction are mainly high-voltage aluminum cables such as steel-cored aluminum stranded wire and aluminum-clad steel-core aluminum stranded wire. The new line length has increased year by year, indicating that the domestic high-voltage transmission line is still in a high-speed growth trend. According to statistics, in the first 11 months of 2013, China's power grid infrastructure construction investment was 337.3 billion yuan, an increase of 6.1% year-on-year.


Relevant media believe that in 2013, the domestic new wire and cable laying is mainly based on UHV power grid construction. It is reported that the State Grid Hami-Zhengzhou UHV DC project is expected to be put into operation this month, and the Xiluodu-Zhejiang UHV DC project under construction is scheduled to be put into operation in 2014, and the Zhebei-Fuzhou UHV AC project is scheduled to be put into operation in 2015.


In addition, the Huainan-Nanjing-Shanghai UHV AC project, the Ximeng-Nanjing UHV AC project, and the Ya'an-Wuhan UHV AC project are also in the evaluation stage. In summary, the construction of domestic UHV power grids will continue to drive demand for aluminum cables in the coming period.


崇明县| 应用必备| 东宁县| 汝阳县| 工布江达县| 安福县| 忻城县| 永州市| 正镶白旗| 漳浦县| 蓝田县| 当雄县| 平度市| 岑溪市| 贡觉县| 北票市| 晴隆县| 贡山| 蒙山县| 井陉县| 色达县| 历史| 平邑县| 方山县| 固阳县| 肃北| 溧水县| 边坝县| 常德市| 平定县| 和平县| 金沙县| 敦煌市| 西青区| 溆浦县| 丹阳市| 新蔡县| 沧源| 宁海县| 大竹县| 阳春市|